Procurement Information — MOQ, Lead Times, Payment & Warranty

Transparent procurement terms for Dengtai steel ladders. No hidden conditions. Everything you need to plan your purchase, from minimum order quantities and lead times to payment methods and warranty coverage. All policies below apply to international export orders.


Quick Reference

Topic Policy Summary Detail Page
MOQ Standard models: 1 unit; Custom: 5 units MOQ Details →
Lead Time Standard: 15-20 working days; Custom: 30-45 working days Lead Time Details →
Payment Terms T/T 30/70 standard; L/C at sight for orders >$10,000 Payment Details →
Samples Standard parts available; freight buyer-paid; fee refunded on first order Sample Policy →
Customization OEM/ODM available; 24h engineer review; CAD drawings included Customization Process →
OEM/ODM Build to your design (OEM) or we design for you (ODM) OEM/ODM Details →
Warranty 5-year manufacturing; material-specific corrosion coverage Warranty Policy →
After-Sales 48h response; free annual inspection for large projects After-Sales Policy →

Procurement Process Overview

Step 1: Specify — Define your requirements: product type, model, height, material, quantity, destination port. Include any special requirements (standards, documentation, environmental conditions).

Step 2: Quote — Receive a detailed quotation within 24 hours. Quote includes: product price, packaging, estimated freight cost, lead time, and documentation package description.

Step 3: Order — Confirm Proforma Invoice (PI). Pay 30% deposit by T/T (or open L/C for orders >$10,000). Production begins on deposit receipt.

Step 4: Produce — Standard models: 15-20 working days. Custom/modified: 30-45 working days. We notify you when production is complete with photos and QC reports.

Step 5: Inspect — Review pre-shipment photos and reports. Optional third-party inspection (SGS, Bureau Veritas, TUV) at your cost. Approve for shipment.

Step 6: Ship — Pay 70% balance (or present L/C documents). Container loaded under supervision with photographic record. Ocean freight to your destination port.

Step 7: Receive — Customs clearance at destination. Inland transport to site. Installation guide included with every ladder.

Step 8: Install — Install per provided guide. Our engineer available for remote video consultation.

Step 9: Support — 5-year manufacturing warranty. 48-hour after-sales response. Spare parts available throughout product life.


End-to-End Timeline (Typical)

Stage Standard Order Custom Order
Quote 24 hours 24 hours (+ drawing time)
Production 15-20 working days 30-45 working days
Pre-shipment inspection 1-2 days 1-2 days
Ocean freight (Asia) 5-12 days 5-12 days
Ocean freight (Europe/US East) 28-35 days 28-35 days
Ocean freight (US West) 15-18 days 15-18 days
Ocean freight (Middle East) 15-22 days 15-22 days
Ocean freight (Africa/SA) 30-40 days 30-40 days
Customs clearance 2-7 days 2-7 days
Total (door-to-door, typical) 6-10 weeks 8-14 weeks

Related Resources



Frequently Asked Questions

What is the minimum order quantity for steel ladders?
Standard models: 1 unit. Custom-engineered ladders: 5 units minimum. This is one of the lowest MOQs in the Chinese steel ladder manufacturing industry. Most competitors require 10-20 units.

What payment terms does Dengtai accept?
Standard terms: T/T 30% deposit with 70% balance before shipment. For orders exceeding $10,000, L/C at sight is available. We do not accept D/A or open account terms for first-time buyers.

How long does delivery take?
Standard models ship within 15-20 working days of order confirmation. Custom or bulk orders require 30-45 working days. Ocean freight transit adds 15-35 days depending on destination.

What compliance documentation is provided?
Every order includes: Certificate of Origin (CCPIT-issued), Commercial Invoice, Packing List, Bill of Lading, material certificates (EN 10204 Type 3.1), weld inspection reports (ISO 5817), coating thickness reports, dimensional conformance report, and Declaration of Conformity. Additional documentation (Form A/E, fumigation cert, CE/UKCA package) available on request.

Can I get a sample before placing a bulk order?
Yes. Standard model samples can be shipped for evaluation. Freight cost is borne by the buyer (FedEx/DHL). The sample cost is refunded against your first production order.

What is the warranty on Dengtai ladders?
5-year manufacturing defect warranty. Corrosion warranty by material: HDG 2 years, SS304 5 years, SS316 10 years. After-sales: 48-hour response to any issue. If a dimensional error is our fault, we bear the full replacement cost including freight.

How do I start the ordering process?
Send your specification to sales@dtsteelladder.com including: ladder type, height, material, quantity, destination port, and applicable standard. Receive a detailed quotation within 24 hours.

The Dengtai Procurement Process

When you source steel ladders from Dengtai, the process follows six clear stages:

Stage 1: Inquiry and Specification — Send your requirements (ladder type, height, material, quantity, destination port, applicable standard) to sales@dtsteelladder.com. Our engineering team reviews your specification and returns a line-item quotation within 24 hours.

Stage 2: Engineering Review — Senior Engineer Jouth Zhao reviews technical feasibility. For standard products, we confirm the specification. For custom products, we return CAD drawings for your approval. This stage typically takes 1-3 business days.

Stage 3: Order Confirmation — 30% T/T deposit confirms your order. For orders over $10,000, L/C at sight is available. Production scheduling begins immediately upon deposit receipt.

Stage 4: Production and QC — Standard models: 15-20 working days. Custom/bulk: 30-45 working days. Our five-step QC process runs throughout: (1) raw material certification verification, (2) ISO 5817 weld inspection at each joint, (3) coating thickness measurement per ISO 2808, (4) pre-assembly fit check with bracket matching, (5) VCI + vacuum-sealed packaging inspection.

Stage 5: Pre-Shipment Review — Before shipment, you receive: QC documentation package (material certs, weld reports, coating reports, dimensional conformance), container loading photographs, and the container seal number. Review and approve before we release the shipment.

Stage 6: Shipment and Delivery — Container loaded at Tianjin port. Shipping documents sent via courier. Customs clearance support documentation provided. After-sales: 48-hour response to any question or issue.


Raw Material Cost Breakdown

Understanding the cost structure of a steel ladder helps buyers evaluate whether a quotation is reasonable and where value engineering opportunities exist.

Material Cost Per Tonne (2026 Indicative)

Material Raw Material Fab Cost Labor Surface Treatment Total/tonne
Q235B HDG $692 $180 $210 Included in fab $1,082
Q345B HDG ~$750 $200 $230 Included in fab ~$1,180
SS304 $2,538 $400 $480 Passivation ~$150 ~$3,568
SS316 $4,615 $600 $850 Passivation ~$200 ~$6,265

A standard 6m caged ladder (CL-HDG-STD) weighs approximately 80-100 kg depending on configuration. At Q235B HDG total cost of ~$1,082/tonne, the material cost is approximately $87-108. The remaining cost in the $180 retail price covers direct labor, factory overhead, packaging, compliance documentation, and margin.

Pricing Formula for Custom Orders

For large-volume or custom orders (>100m total length), Dengtai uses the formula:
Price = Material Cost + Sheet Metal Processing + Labor + Surface Treatment + 15% Margin

This transparent pricing methodology allows buyers to understand what drives cost and identify opportunities for value engineering:

  • Wider rung spacing (300mm standard): No cost change — standard spacing is already optimized
  • Non-standard width: Proportional material increase
  • Different material grade: Cost changes per the raw material differential above
  • Additional surface treatment (duplex coating, special paint): Incremental cost quoted separately
  • Volume discount: Applied progressively based on total project quantity

Request a line-item quotation to see the cost breakdown for your specific specification.


Lead Time Management and Optimization

Factors That Extend Lead Time

Factor Impact Mitigation
Custom engineering +15-25 working days Provide complete specifications upfront; approve drawings promptly
Non-standard material procurement +7-15 working days Use in-stock materials where possible (Q235B, Q345B, SS304, SS316 are standard stock)
High order volume (>500m) +10-20 working days Split production lots if partial delivery is acceptable
Peak season (Aug-Oct) +5-10 working days Order in Q1-Q2 for Q4 delivery
Third-party inspection scheduling +3-7 working days Book the inspector when production starts, not when complete
Classification society involvement +10-20 working days Engage the surveyor at the drawing approval stage

Lead Time by Product Category

Product Category Standard Lead Time Notes
Standard fixed ladder (FL series) 15 working days 1-50 units; for >50 add 5 days per additional 50
Standard caged ladder (CL series) 15-20 working days Cage fabrication adds 0-5 days
Multi-section caged ladder 20-25 working days Platform fabrication and pre-assembly check add time
Custom ladder (CS-ENG) 30-45 working days Includes engineering, drawing approval, custom fabrication
Accessories only (brackets, hoops) 10-15 working days Shorter if combined with ladder order
Spare parts 5-7 working days In-stock parts ship immediately

Rush orders: For time-critical projects, we can evaluate rush production. Rush orders typically add 15-25% to the product cost and reduce lead time by 5-10 working days for standard products. Rush production is subject to current production schedule availability.


Quality Documentation Package Details

Every Dengtai order ships with a comprehensive quality documentation package. Here is the detailed content of each document:

1. Material Certificates (EN 10204 Type 3.1)

  • Steel mill name and country of origin
  • Heat number (links to specific production batch)
  • Chemical composition analysis (C, Si, Mn, P, S, Cr, Ni, Mo for stainless)
  • Mechanical properties (yield strength, tensile strength, elongation)
  • Impact test results (if specified)
  • Third-party inspection body verification (if specified)

2. Weld Inspection Report

  • WPS (Welding Procedure Specification) reference
  • Welder qualification certificate reference
  • Weld map showing inspection points by joint number
  • Visual inspection results per ISO 17637
  • NDT results if specified (PT/MT/UT per project requirements)
  • Acceptance criteria: ISO 5817 Level C (standard) or Level B (stringent)

3. Coating/Plating Report

  • HDG Coating Thickness: Measured per ISO 2808 (magnetic method), minimum 5 readings per ladder section, target >80um average, no single reading <56um per ISO 1461
  • Stainless Surface: Passivation certificate per ASTM A380, surface roughness measurement (target Ra 0.4-0.8um for #240 brushed finish)
  • Visual inspection: Uniform appearance, no bare spots, no lumps, no ash deposits

4. Dimensional Conformance Report

  • Overall length: Measured to +/- 10mm
  • Width (inside stile): Measured to +/- 5mm
  • Rung spacing: Measured at 5 points, all to be 300mm +/- 3mm
  • Cage hoop diameter: Measured at 3 hoops, to be 800mm +/- 5mm
  • Cage hoop spacing: Measured at 3 intervals, to be 300mm +/- 5mm
  • Top extension: Verified 1,100mm above last rung

5. Pre-Assembly Fit Check Report

  • Bracket-to-stile fit verification (all brackets trial-assembled)
  • Section-to-section flange alignment check (multi-section ladders)
  • Platform-to-ladder interface verification
  • Photographs of pre-assembly setup

6. Packaging Verification Report

  • VCI wrapping confirmation per MIL-B-22020
  • Vacuum seal integrity check
  • Pallet/crate construction and ISPM 15 stamp verification
  • Individual component identification tag verification

After-Sales Support Commitment

Dengtai’s commitment extends beyond delivery:

48-Hour Response Guarantee: Any question, issue, or support request receives a substantive response within 48 hours (business days). For urgent issues, WhatsApp provides same-day response.

Warranty Coverage: 5 years against manufacturing defects. If a manufacturing defect is confirmed, we replace the affected components at our cost including freight. The warranty covers: structural failure of welds or materials under rated load, coating failure (HDG delamination, premature corrosion beyond the rated environment), and dimensional non-conformance to the approved drawing. The warranty excludes: damage from misuse or overloading beyond rated capacity, damage from modification after delivery, and normal wear of sacrificial coatings in rated environments.

Spare Parts Availability: We maintain an inventory of standard components (brackets, cage hoops, rungs) for all current models. Spare parts ship within 5-7 working days. For custom components, we maintain CAD records and can re-manufacture to the original specification within 15-20 working days.

Installation Support: Installation manuals are provided with every shipment. For large projects, we offer remote installation support via video call (complimentary) or on-site supervision (quoted separately based on location and duration).

Annual Check-In (Large Projects): For projects exceeding $20,000, we offer a complimentary annual check-in: an email review of the installation condition, any operational feedback, and future requirements. This maintains the relationship and identifies repeat business opportunities.

Start Procurement

Email your requirements for a detailed quotation within 24 hours.

Email: sales@dtsteelladder.com
WhatsApp: +86 155 1187 9488

Request a Quote → | View All Products →

****:。MOQ(1/5)、(15-20/30-45)、(T/T 30%+70%,$10,000L/C at sight)、(//)、(24h/CAD)、OEM/ODM、(5+:HDG 2/SS304 5/SS316 10)、(48h/)。9(→→→→→→→→)(6-10/8-14)。SGS/Bureau Veritas/TUV。24。