Secure and transparent payment terms for international orders. Dengtai accepts T/T (wire transfer) and L/C (Letter of Credit). All payments in USD. Bank details provided on the Proforma Invoice.
Standard Payment Terms
| Term | Structure | Minimum Order | Best For |
|---|---|---|---|
| T/T 30/70 | 30% advance deposit + 70% before shipment | All orders | Standard international trade; most common |
| L/C at sight | Irrevocable L/C payable on presentation of shipping documents | Orders >$10,000 | Buyers who prefer bank-intermediated payment |
| T/T 100% advance | Full payment with order | Sample orders, orders <$500 | Small orders to minimize transaction costs |
T/T 30/70 Process (Most Common)
- Proforma Invoice (PI) — Issued after confirming specification, price, lead time, and shipping estimate
- 30% deposit — Paid by T/T (wire transfer). Production begins upon receipt of deposit
- Production — Standard 15-20 working days, custom 30-45 working days
- Production complete notification — We send photos of completed products and QC reports
- 70% balance — Payable after you review and approve pre-shipment inspection
- Shipment — Goods released upon receipt of balance payment. Shipping documents (B/L, invoice, packing list, certificate of origin) sent by courier or email
L/C (Letter of Credit) Details
Available for orders exceeding $10,000.
- Type: Irrevocable L/C at sight
- Issuing bank: Must be a reputable international bank acceptable to our bank (Bank of China or ICBC)
- L/C terms: Must align with our standard documentation package — we provide a draft L/C template for your bank
- Documents required under L/C:
- Commercial Invoice
- Packing List
- Bill of Lading (Ocean)
- Certificate of Origin (Form A or Form F where applicable)
- Beneficiary’s Certificate of Quality (QC report)
- L/C costs: L/C opening and confirmation charges borne by buyer
- Validity period: L/C must remain valid for at least 21 days after shipment date to allow document presentation
Payment Security
- Company registration: Dengtai Staircase Manufacturing Co., Ltd. is a legally registered Chinese manufacturing company (est. 2003, 22+ years operating history)
- Bank details: Provided on official company letterhead with company chop
- PI reference: All payments must reference the PI number for proper allocation
- No agent/intermediary payments: All payments go directly to Dengtai’s corporate bank account — never to individual or third-party accounts
- Sample orders encouraged: First-time buyers are encouraged to place a sample order (1-2 units, T/T 30/70) to build payment trust
Currency
All prices quoted in USD (United States Dollars). Payments accepted in USD only. For EUR or other currency payments, contact us for currency-specific arrangements.
Frequently Asked Questions
What is the minimum order quantity for steel ladders?
Standard models: 1 unit. Custom-engineered ladders: 5 units minimum. This is one of the lowest MOQs in the Chinese steel ladder manufacturing industry. Most competitors require 10-20 units.
What payment terms does Dengtai accept?
Standard terms: T/T 30% deposit with 70% balance before shipment. For orders exceeding $10,000, L/C at sight is available. We do not accept D/A or open account terms for first-time buyers.
How long does delivery take?
Standard models ship within 15-20 working days of order confirmation. Custom or bulk orders require 30-45 working days. Ocean freight transit adds 15-35 days depending on destination.
What compliance documentation is provided?
Every order includes: Certificate of Origin (CCPIT-issued), Commercial Invoice, Packing List, Bill of Lading, material certificates (EN 10204 Type 3.1), weld inspection reports (ISO 5817), coating thickness reports, dimensional conformance report, and Declaration of Conformity. Additional documentation (Form A/E, fumigation cert, CE/UKCA package) available on request.
Can I get a sample before placing a bulk order?
Yes. Standard model samples can be shipped for evaluation. Freight cost is borne by the buyer (FedEx/DHL). The sample cost is refunded against your first production order.
What is the warranty on Dengtai ladders?
5-year manufacturing defect warranty. Corrosion warranty by material: HDG 2 years, SS304 5 years, SS316 10 years. After-sales: 48-hour response to any issue. If a dimensional error is our fault, we bear the full replacement cost including freight.
How do I start the ordering process?
Send your specification to sales@dtsteelladder.com including: ladder type, height, material, quantity, destination port, and applicable standard. Receive a detailed quotation within 24 hours.
The Dengtai Procurement Process
When you source steel ladders from Dengtai, the process follows six clear stages:
Stage 1: Inquiry and Specification — Send your requirements (ladder type, height, material, quantity, destination port, applicable standard) to sales@dtsteelladder.com. Our engineering team reviews your specification and returns a line-item quotation within 24 hours.
Stage 2: Engineering Review — Senior Engineer Jouth Zhao reviews technical feasibility. For standard products, we confirm the specification. For custom products, we return CAD drawings for your approval. This stage typically takes 1-3 business days.
Stage 3: Order Confirmation — 30% T/T deposit confirms your order. For orders over $10,000, L/C at sight is available. Production scheduling begins immediately upon deposit receipt.
Stage 4: Production and QC — Standard models: 15-20 working days. Custom/bulk: 30-45 working days. Our five-step QC process runs throughout: (1) raw material certification verification, (2) ISO 5817 weld inspection at each joint, (3) coating thickness measurement per ISO 2808, (4) pre-assembly fit check with bracket matching, (5) VCI + vacuum-sealed packaging inspection.
Stage 5: Pre-Shipment Review — Before shipment, you receive: QC documentation package (material certs, weld reports, coating reports, dimensional conformance), container loading photographs, and the container seal number. Review and approve before we release the shipment.
Stage 6: Shipment and Delivery — Container loaded at Tianjin port. Shipping documents sent via courier. Customs clearance support documentation provided. After-sales: 48-hour response to any question or issue.
Raw Material Cost Breakdown
Understanding the cost structure of a steel ladder helps buyers evaluate whether a quotation is reasonable and where value engineering opportunities exist.
Material Cost Per Tonne (2026 Indicative)
| Material | Raw Material | Fab Cost | Labor | Surface Treatment | Total/tonne |
|---|---|---|---|---|---|
| Q235B HDG | $692 | $180 | $210 | Included in fab | $1,082 |
| Q345B HDG | ~$750 | $200 | $230 | Included in fab | ~$1,180 |
| SS304 | $2,538 | $400 | $480 | Passivation ~$150 | ~$3,568 |
| SS316 | $4,615 | $600 | $850 | Passivation ~$200 | ~$6,265 |
A standard 6m caged ladder (CL-HDG-STD) weighs approximately 80-100 kg depending on configuration. At Q235B HDG total cost of ~$1,082/tonne, the material cost is approximately $87-108. The remaining cost in the $180 retail price covers direct labor, factory overhead, packaging, compliance documentation, and margin.
Pricing Formula for Custom Orders
For large-volume or custom orders (>100m total length), Dengtai uses the formula:
Price = Material Cost + Sheet Metal Processing + Labor + Surface Treatment + 15% Margin
This transparent pricing methodology allows buyers to understand what drives cost and identify opportunities for value engineering:
- Wider rung spacing (300mm standard): No cost change — standard spacing is already optimized
- Non-standard width: Proportional material increase
- Different material grade: Cost changes per the raw material differential above
- Additional surface treatment (duplex coating, special paint): Incremental cost quoted separately
- Volume discount: Applied progressively based on total project quantity
Request a line-item quotation to see the cost breakdown for your specific specification.
Lead Time Management and Optimization
Factors That Extend Lead Time
| Factor | Impact | Mitigation |
|---|---|---|
| Custom engineering | +15-25 working days | Provide complete specifications upfront; approve drawings promptly |
| Non-standard material procurement | +7-15 working days | Use in-stock materials where possible (Q235B, Q345B, SS304, SS316 are standard stock) |
| High order volume (>500m) | +10-20 working days | Split production lots if partial delivery is acceptable |
| Peak season (Aug-Oct) | +5-10 working days | Order in Q1-Q2 for Q4 delivery |
| Third-party inspection scheduling | +3-7 working days | Book the inspector when production starts, not when complete |
| Classification society involvement | +10-20 working days | Engage the surveyor at the drawing approval stage |
Lead Time by Product Category
| Product Category | Standard Lead Time | Notes |
|---|---|---|
| Standard fixed ladder (FL series) | 15 working days | 1-50 units; for >50 add 5 days per additional 50 |
| Standard caged ladder (CL series) | 15-20 working days | Cage fabrication adds 0-5 days |
| Multi-section caged ladder | 20-25 working days | Platform fabrication and pre-assembly check add time |
| Custom ladder (CS-ENG) | 30-45 working days | Includes engineering, drawing approval, custom fabrication |
| Accessories only (brackets, hoops) | 10-15 working days | Shorter if combined with ladder order |
| Spare parts | 5-7 working days | In-stock parts ship immediately |
Rush orders: For time-critical projects, we can evaluate rush production. Rush orders typically add 15-25% to the product cost and reduce lead time by 5-10 working days for standard products. Rush production is subject to current production schedule availability.
Quality Documentation Package Details
Every Dengtai order ships with a comprehensive quality documentation package. Here is the detailed content of each document:
1. Material Certificates (EN 10204 Type 3.1)
- Steel mill name and country of origin
- Heat number (links to specific production batch)
- Chemical composition analysis (C, Si, Mn, P, S, Cr, Ni, Mo for stainless)
- Mechanical properties (yield strength, tensile strength, elongation)
- Impact test results (if specified)
- Third-party inspection body verification (if specified)
2. Weld Inspection Report
- WPS (Welding Procedure Specification) reference
- Welder qualification certificate reference
- Weld map showing inspection points by joint number
- Visual inspection results per ISO 17637
- NDT results if specified (PT/MT/UT per project requirements)
- Acceptance criteria: ISO 5817 Level C (standard) or Level B (stringent)
3. Coating/Plating Report
- HDG Coating Thickness: Measured per ISO 2808 (magnetic method), minimum 5 readings per ladder section, target >80um average, no single reading <56um per ISO 1461
- Stainless Surface: Passivation certificate per ASTM A380, surface roughness measurement (target Ra 0.4-0.8um for #240 brushed finish)
- Visual inspection: Uniform appearance, no bare spots, no lumps, no ash deposits
4. Dimensional Conformance Report
- Overall length: Measured to +/- 10mm
- Width (inside stile): Measured to +/- 5mm
- Rung spacing: Measured at 5 points, all to be 300mm +/- 3mm
- Cage hoop diameter: Measured at 3 hoops, to be 800mm +/- 5mm
- Cage hoop spacing: Measured at 3 intervals, to be 300mm +/- 5mm
- Top extension: Verified 1,100mm above last rung
5. Pre-Assembly Fit Check Report
- Bracket-to-stile fit verification (all brackets trial-assembled)
- Section-to-section flange alignment check (multi-section ladders)
- Platform-to-ladder interface verification
- Photographs of pre-assembly setup
6. Packaging Verification Report
- VCI wrapping confirmation per MIL-B-22020
- Vacuum seal integrity check
- Pallet/crate construction and ISPM 15 stamp verification
- Individual component identification tag verification
After-Sales Support Commitment
Dengtai’s commitment extends beyond delivery:
48-Hour Response Guarantee: Any question, issue, or support request receives a substantive response within 48 hours (business days). For urgent issues, WhatsApp provides same-day response.
Warranty Coverage: 5 years against manufacturing defects. If a manufacturing defect is confirmed, we replace the affected components at our cost including freight. The warranty covers: structural failure of welds or materials under rated load, coating failure (HDG delamination, premature corrosion beyond the rated environment), and dimensional non-conformance to the approved drawing. The warranty excludes: damage from misuse or overloading beyond rated capacity, damage from modification after delivery, and normal wear of sacrificial coatings in rated environments.
Spare Parts Availability: We maintain an inventory of standard components (brackets, cage hoops, rungs) for all current models. Spare parts ship within 5-7 working days. For custom components, we maintain CAD records and can re-manufacture to the original specification within 15-20 working days.
Installation Support: Installation manuals are provided with every shipment. For large projects, we offer remote installation support via video call (complimentary) or on-site supervision (quoted separately based on location and duration).
Annual Check-In (Large Projects): For projects exceeding $20,000, we offer a complimentary annual check-in: an email review of the installation condition, any operational feedback, and future requirements. This maintains the relationship and identifies repeat business opportunities.
Start Your Order
Email requirements for a Proforma Invoice with committed price, lead time, and payment details.
Email: sales@dtsteelladder.com
WhatsApp: +86 155 1187 9488
FAQ
Q: Why T/T 30/70 instead of 100% upfront?
The 30% deposit confirms your order and covers raw material procurement. The 70% balance before shipment ensures the order is complete and QC-approved before you make full payment. This is standard practice in Chinese industrial manufacturing export.
Q: Is L/C (Letter of Credit) available?
Yes, L/C at sight is available for orders over $10,000. The L/C must be issued by a reputable international bank and be irrevocable. L/C terms must be confirmed before order acceptance.
Q: Can I pay after receiving the goods?
D/A (documents against acceptance) and open account terms are not available for first-time buyers. After establishing a purchase history, alternative payment terms may be considered on a case-by-case basis.
Request a Quote → | Procurement Overview → | Import Guide →